Project Verification

Review the evidence.
Verify the work.

Independent document, evidence and site verification to identify gaps, improve traceability and support clear project close-out.

A practical verification pathway.

IQTS establishes an agreed verification scope, reviews the available evidence and observable site conditions, and reports findings in a clear format for the project team.

01

Requirements and Scope Review

We establish the verification basis by reviewing relevant specifications, drawings, inspection and test plans, contractual requirements and agreed project deliverables.

02

Document and Evidence Verification

We review available test reports, inspection records, dockets, photographs, approvals, nonconformance records and other evidence for completeness, consistency and traceability.

03

Physical Site Verification

We undertake site inspections to compare observable conditions and completed work with the available project documents, defined verification scope and supporting records.

04

Gap and Close-Out Reporting

We identify missing, inconsistent or unresolved evidence and provide a practical action register or verification summary to support project handover and close-out.

Evidence considered during verification.

The exact evidence depends on the agreed scope, project phase and documents made available to IQTS.

01

Project requirements

Specifications, drawings, contract requirements, inspection and test plans, hold points and agreed deliverables.

02

Quality and testing records

Test reports, inspection records, lot registers, checklists, approvals, supplier certificates and material dockets.

03

Traceability and close-out

Photographs, location references, nonconformance records, corrective actions, handover schedules and completion evidence.

04

Observed site conditions

Physical observations recorded during an agreed site inspection and compared with the available project documentation and evidence.

External specialist coordination

Specialist input, coordinated when required.

If the verification process identifies a need for specialist testing or engineering input, IQTS can help define the requirement and facilitate a suitably qualified external provider.

IQTS does not provide engineering design, engineering certification or statutory engineering sign-off. Any engineering service is separately performed and reported by the appointed external engineer under their own professional responsibility.

  • Clarify the required specialist scope and information
  • Help obtain and coordinate external provider quotations
  • Coordinate site access, documents and project interfaces
  • Track external deliverables within the verification close-out

Project verification

Have a project or evidence package to review?

Discuss the verification scope